"Commissioned the asphalt paver in nine days — screed heat mapped cleanly and we held mat temperature through a windy corridor night shift."
8–13 ft paving widths · electric or propane screed heat · EPA Tier 4 Final power · slope-ready graders sized for subdivision streets and corridor base work.
Lead times, emissions paperwork, screed rebuilds and parts staging — answers paving foremen can take into a bid meeting.
Standard asphalt paver packages ship in 12–16 weeks ex-works, including Tier 4 Final documentation, screed heat checkout and a two-day on-site commissioning walk with your paving crew.
Current paver and grader powerplants ship with Tier 4 Final aftertreatment. NOx and PM logs are issued per serial number so municipal night paving clears environmental review.
Contracted highway corridors target under 18-hour mean time to repair, with screed plates, conveyor chains and grader blades staged at regional parts hubs.
Wear surveys usually land between 18–22% of new-machine list for track groups or moldboard edge packages, quoted after measuring wear depth and bolt stretch on your specific unit.
Yes — commissioning includes screed temperature mapping, crown / slope verification and operator coaching before density acceptance starts arguing with your nuclear gauges.
Representative values for highway and municipal packages. Final quotes attach serial-specific load charts and emissions sheets.
| Engine & Emissions | |
|---|---|
| Engine power | 55 – 129 kW (74 – 173 hp) class platforms by machine family |
| Aftertreatment | Tier 4 Final DPF + SCR with DEF alarms and regen coaching |
| Documentation | Per-serial NOx / PM logs for municipal and airport jobs |
| Paving System | |
| Mat width class | 2.4 – 4.0 m packages for streets and corridor lanes |
| Screed heat | Electric or propane zone control with temperature mapping |
| Hydraulic system pressure | Up to 320 bar (32 MPa) on feed / screed circuits |
| Feed system | Hopper + conveyor configurations for continuous truck cycles |
| Grading, Compaction & Chassis | |
| Operating weight | Approx. 7,500 – 18,000 kg depending on paver / grader package |
| Moldboard | 3.0 – 3.7 m packages with replaceable cutting edges |
| Compaction force | Plate compactors rated to about 130 kN class centrifugal force |
| Vibration frequency | Selectable RPM bands matched to lift thickness and aggregate |
| Slope control | Optional cross-slope kits for base course and shoulder work |
| Cab & Operator | |
| Controls | Operator-friendly layout with clear grade and heat readouts |
| Visibility | Open sightlines to screed ends and moldboard tips |
| Service & Documentation | |
| Parts staging | Regional hubs stock screed plates, chains, blades and filters |
| Commissioning | Two-day on-site audit with paving crew checklist |
"Commissioned the asphalt paver in nine days — screed heat mapped cleanly and we held mat temperature through a windy corridor night shift."
"Mini grader held cross-slope on subdivision streets without fighting the moldboard. Parts van staged cutting edges before week two."
"Tack distributor and plate compactors arrived as a package — edges stayed clean and trench backfill kept up with the curb crew."
Share company, site country, equipment class and delivery month. A LeeBoy application engineer replies within 24 hours with a screed / moldboard recommendation pack.
Regional parts hubs · under 18h MTTR on contracted corridors · Tier 4 Final documentation with every serial.